Product Detail :
|
Flood control works at various location on the right bank of noa-dehing river in lekang ph-i in namsai. Work of sheet pilling spur with 8mm thick z type for a length 15. Construction of bank revetment works with sheet pilling 8mm thick z type for a length of 15m supported with earthen embankment and extension of earthen embankment from bank revetment to down side of deobeel village.
|