|
Product Detail :
|
ANNUAL CONTRACT FOR THE WORK OF TRANSPORTATION OF POWER TRANSFORMER / ICT / REACTOR Loading/Unloading of Power T/f 20-50MT, Winching on Track-Power T/f 20-50 MT, Winching on Ground-Power T/f 20-50 MT, Transport of T/f =50MT =50km, Transport of T/f =50MT 50-100 km, Transport of T/f =50MT >100km, Loading/Unloading of Power T/f 50-100 MT, Winching on Track-Power T/f 50-100 MT, Winching on Ground-Power T/f 50-100 MT, Transport of T/f 50-100 MT =50km, Transport of T/f 50-100 MT 50-100 km, Transport of T/f 50-100 MT >100km, Loading&Unloading of Power T/f >100MT, Winching on Track-Power T/f Above 100MT, Winching on Ground-Power T/f Above 100MT, Transport of T/f >100MT =50km, Transport of T/f >100MT 50-100 km, Transport of T/f >100MT >100km, Transport of Materials =50km by Road, Transport of Materials 50-100 km, Transport of Materials >100km by Road, Loading&Unloading of Materials by Manual, Loading&Unloading of Materials by Crane, Turning of T/f / ICT by =180° on Rail, Turning of T/f / ICT by =180° on Ground, Transport by Truck/Day per Job, Transport T/f/ICT by Hyd Trailor>250km, Transport of T/f by Hyd. Trailor =100km, Transport of T/f by Hyd. Trailor >100km, Dismantlling of PTR/ICT @18%, PL_Dismantling 50MVA 132/33-22kV T/F, PL_Dismantling 50MVA 220/33-22kV T/F, PL_Dismantling 100MVA 220/132-100kV ICT, PL_Dismantling 200MVA 220/132-100kV ICT, PL_Dismantling 315MVA 400kV ICT, PL_Dismantling 1x105MVA 400/220kV ICT, PL_Dismantling 1x167MVA 400/220kV ICT, PL_Dismantling 3x105MVA 400/220kV ICT, PL_Dismantling 3x167MVA 400/220kV ICT
|
| Tender Detail : |
ANNUAL CONTRACT FOR THE WORK OF TRANSPORTATION OF POWER TRANSFORMER / ICT / REACTOR |